Urban planning conditions and restrictions (MUO) in Ukraine: what they are and how to read them

One 1 ha plot with different MUO: 15 m and 40% give 4 storeys and 16,000 m², 27 m and 30% give 8 storeys and 24,000 m², 73.5 m and 20% give 23 storeys and 46,000 m²

Urban planning conditions and restrictions (MUO, the Ukrainian abbreviation) set the limits and basic parameters within which a building may be designed on a specific plot: the height limit, site coverage, setbacks and restricted zones. They are issued free of charge within 10 working days and remain valid until construction is completed.

How MUO carve a building out of a 1 ha plot: setbacks leave 8,460 m², protection zones about 7,000 m², 30% coverage gives a 3,000 m² footprint, a 27 m height limit gives 8 storeys and up to 24,000 m²

In this article: What MUO are · 10 items · How to read · Height and storeys · How to get · Validity · Without MUO · Kyiv

What MUO do to a plot. In the illustrative example above, setbacks and protection zones leave about 7,000 m² of a 1 ha plot, 30% site coverage gives a 3,000 m² building footprint, and a 27 m height limit gives 8 storeys, that is, up to 24,000 m² of floor area. Population density, insolation and parking can reduce it further.

What urban planning conditions and restrictions are

Under Ukrainian law, MUO are one of the three main components of the initial design data, together with the technical conditions for utility connections and the design brief (Article 29 of the Law “On Regulation of Urban Planning Activity”). Anyone who intends to build on a plot they own or use must obtain them.

MUO are not a building permit. They define the limits within which a project may be designed, while the right to start works comes from other documents after the design stage. Yet the MUO parameters directly shape the project figures and the size of the building, and compliance with them matters at the design review and when the building is put into operation. For an architect, this is the first document a project starts from.

10 working days to issue · free of charge · up to 3 documents with the application · 10 items in the document · valid until construction is completed

What MUO contain: 10 items and what each one changes in a project

The list in the law is exhaustive: MUO may not contain any other conditions (Article 29, part 5). Here is what they include and what it means for a project:

ItemWhat it contains and what it means for the project
Service dataName of the project, its identifier and client details: they link the MUO to the plot in the register.
Land useWhether the plot’s designated and functional use complies with the planning documentation. If not, MUO will not be issued: this is one of the three grounds for refusal.
Height limitThe maximum height in metres, including restrictions near airfields. This is the ceiling for the building, from which the architect derives the storeys.
Site coverageThe share of the plot that buildings may occupy: at 30% on a 1 ha plot, up to 0.3 ha.
DensityMaximum population density for housing: the cap on residents, and therefore on flats and floor area.
DistancesMinimum distances to red lines, building lines and existing buildings: where exactly the building may stand.
Planning restrictionsHeritage protection, historic areas, landscape, archaeology, nature reserves, riparian strips, sanitary zones, airfields, emergency risk zones: building is not allowed here or needs approval.
Protection zonesZones of transport, communication and utility networks and distances to networks: strips that take away buildable area.
Civil protectionRequirements for the civil protection engineering section: the project may need a shelter or a dual-use structure.

What MUO do not contain. There are no separate requirements on landscaping and greening, parking numbers, facade design or insolation, although many sources claim otherwise. These requirements come from building codes during design, and MUO only sometimes mention them in notes.

How to read MUO: what an architect checks first

The law says what MUO must contain, but not how they are written. The public register shows very different wording, so we read every item with a pencil and immediately translate it into the geometry of the plot: each line becomes a line or a zone on the plan.

Example MUO and plot plan: 6 m to the red lines, 10 m separation from neighbouring buildings, 10 m gas pipe protection zone, heritage protection zone, 30% site coverage

Height: metres, storeys or a mark above sea level

The law requires a height limit in metres. In practice, Kyiv MUO in the register also say things like “26 storeys (278 m in BSV)…” or “no more than 3 storeys excluding the attic. The final height is to be determined by the design documentation…”. BSV is the Baltic height system: this is an elevation above sea level, not the height of the building, so the ground elevation of the plot has to be subtracted. We convert storeys into metres ourselves, as shown below.

If a plot is near an airfield, the height is also limited by the rules for airfield areas. Such a flight safety zone appears in our site analysis below.

Site coverage: count it from the plot area

In real MUO this is often just a number: “30”. On a 2.3 ha plot this means buildings may occupy up to 0.69 ha, and the rest remains for courtyards, driveways and greenery. Some MUO separately require parking areas to be included in the coverage, so we count parking footprints from the start.

Population density: the cap on the number of flats

For housing, MUO limit the number of residents per hectare of the residential unit, that is, the block or neighbourhood. This determines how many flats and square metres of housing will fit. Sometimes, instead of a number, MUO refer to building codes and ask to show that there are enough schools and social facilities within walking distance. Then an urban planning calculation with housing and service figures becomes part of the concept.

Setbacks: where exactly the building can stand

The red line separates the plot from the street, and the building line shows how close the facade may come. Kyiv MUO say it directly: light wells, entrances, steps, drainage and manholes must also stay on the plot, outside the street red lines and utility protection zones. Distances to neighbouring buildings come from fire and household separation and from insolation: a new building may not deprive existing flats of the required sunlight.

Restricted zones: what takes away area before the first sketch

Before the first sketch, we overlay all zones on the topographic survey of the plot. In our analysis of an industrial area on the Dnipro riverbank, these were sanitary buffers from a highway (50 m), a railway (100 m), a power plant (100 m) and an asphalt plant (1,000 m), a flight safety restriction zone, a riparian protection strip, flooding and the border of a historic area.

Analysis of urban planning restrictions on a Dnipro riverbank site: sanitary buffers from roads, railway and plants, flight safety zone, riparian strip, flooding, historic area border

On a plot for a residential district outside the city, the zones were narrow but long: protection strips of 4 and 10 m along medium- and high-pressure gas pipes, 5 m along the sewer, 10 m along a 10 kV power line, plus 50 m from an industrial site and from the forest.

Planning restrictions on a topographic survey: protection zones of gas pipes 4 and 10 m, sewer 5 m, power line 10 m, industrial site and forest 50 m each

What remains after the overlay is the real buildable footprint. This, not the plot area in the cadastre, is where we start an architectural concept.

Land use: the first reason for refusal

MUO record whether the designated use of the plot in the cadastre and its functional use in the planning documentation match what you want to build. If not, MUO will not be issued: a mismatch between the development intent and the planning documentation is one of the three grounds for refusal. So it is worth checking the land use before buying a plot.

Civil protection: when the project will include a shelter

The tenth MUO item concerns the civil protection engineering section. It is mandatory for buildings of medium (CC2) and significant (CC3) consequence classes where more than 50 people stay permanently or more than 100 periodically. For new apartment buildings, dormitories and hotels of these classes and occupancy, the law directly requires a protective structure or a dual-use structure (Article 31, part 10). Who it applies to, how much floor area a shelter takes and whether parking can serve is covered in our article on shelters in new buildings.

How the MUO height limit turns into storeys

MUO give metres, and the architect counts the storeys. Storey height is measured from floor to floor; the floor-to-ceiling height of habitable rooms must be at least 2.5 m, and 2.7 m where the average July temperature is 21 °C or higher (DBN V.2.2-15:2019). A retail ground floor is made taller, and a parapet or roof is added on top.

Diagram: a 27 m height limit fits 8 storeys of housing with a retail ground floor, 7 storeys of 3.3 m or 6 office storeys of 3.9 m

So the same 27 m height limit gives 8 storeys of housing with a retail ground floor, 7 storeys with ceilings of about 3 m, or 6 office storeys. If a financial model relied on an “extra” storey, the MUO will show it earlier than any design review.

Fire codes have their own “conventional height”, and its thresholds change the building too: above 26.5 m, fire engine access roads must run 9–11 m from the wall instead of 5–7 m (DBN B.2.2-12:2019), and buildings with a conventional height above 73.5 m are also designed under the high-rise code (DBN V.2.2-41). This is why we always check the MUO height limit against these thresholds.

A typical case: a 1,000 m² plot in the city centre, an investor counting on seven storeys, and MUO that set a 15 m height limit. A seven-storey building does not fit into that envelope, and the concept has to be recalculated before money goes into design.

How to get MUO

Who issues MUO

The authorised urban planning and architecture body of the community where the plot is located. In Kyiv, this is the Department of Urban Planning and Architecture of the Kyiv City State Administration. If a project covers several communities in one region, since 2026 MUO are issued by the regional state administration’s architecture unit, and if it covers several regions, by the Ministry for Development of Communities and Territories (Law No. 4778-IX).

Which documents are required

An application with the cadastral number of the plot and up to three documents:

  • a copy of the title or land use document, or a superficies agreement, only if the right is not registered in the State Register of Property Rights;
  • for reconstruction or restoration: a copy of the title document for the building on the plot or its owner’s consent, again only if the right is not registered;
  • an extract from the topographic survey plan at a scale of 1:2000.

The list is exhaustive: the authority obtains all other information from the registers itself. An urban planning calculation is not attached to the application: the requirement to attach it applied only until 1 January 2019, although it still appears in guides. The calculation is useful to a developer for their own decision, not to the authority for issuing MUO.

How to apply, how long it takes and what it costs

Online via the Diia portal with a qualified electronic signature, or at an administrative service centre. MUO are free of charge: the decision is made within 10 working days of the application being registered, and the MUO are approved by an order of the authority. The steps are:

  1. An application with the cadastral number via Diia or an administrative service centre.
  2. A check of the documents and of compliance with the planning documentation, up to 10 working days.
  3. An order approving the MUO, or a reasoned refusal.
  4. An entry in the public register of the Unified State Electronic System for Construction.
  5. Design within the MUO; the document stays valid until construction is completed.

Grounds for refusal

There are only three: the required documents were not submitted, the land or building documents contain false information, or the development intent does not comply with the planning documentation. A refusal must state the reason and is issued within the same period, with the applicant’s right to take part in the proceedings under the Law “On Administrative Procedure”.

What changed in 2026

Since July 2026, the system builds MUO from data in the urban planning cadastre. If the current planning documentation for the area is not in the cadastre, the system will not allow the issue to be completed (Ministry for Development, 06.07.2026). So it is worth checking this too before buying a plot.

How long MUO last and how to change them

MUO remain valid until construction is completed, even if the client changes. They can be amended by the issuing authority at the client’s request or by a decision of an administrative court. MUO can be terminated in only two ways: the client withdraws them, or an administrative court cancels them (Article 29, part 8, as amended in 2024).

When MUO are not needed

For a detached, country or garden house of up to two storeys excluding the attic and up to 500 m², a building passport is enough: such houses are designed without MUO (Article 27 of the Law). A separate ministerial list (Order No. 289, as amended on 13.10.2026) exempts from MUO, among others:

  • reconstruction of residential and non-residential premises without changing their external configuration and use;
  • restoration and major repairs of buildings;
  • landscaping of courtyards, playgrounds and sports grounds, small architectural forms and fences;
  • temporary structures for business;
  • internal building services and rooftop solar power plants;
  • reconstruction of networks within allotted land without changing their geometry.

But once the use changes, MUO are required: the register contains Kyiv MUO from 2026 for converting a flat into a shop, where the height field reads “No change to the height of the premises”.

How to find MUO for your plot or the neighbouring one

All registered MUO are open in the register of the Unified State Electronic System for Construction: each card shows the height limit, site coverage, setbacks and restrictions. Before buying a plot, it is worth looking at the neighbours’ MUO too: their height will affect your insolation and distances.

Kyiv: why height in the centre depends on more than the MUO

Kyiv has many monuments, historic quarters and Dnipro slopes, so for central plots MUO are only part of the picture. If a plot lies in a historic area or a monument protection zone, MUO record it among the planning restrictions, and the project is agreed with the cultural heritage protection authorities (Law “On Protection of Cultural Heritage”).

The Ministry of Culture approved the boundaries and regimes of Kyiv’s historic areas by Order No. 599 of 2 August 2021, but its application has been challenged in court more than once. So for a specific plot we look at which restrictions are recorded in the MUO and the cadastre and what follows from them.

A common belief is that buildings in the historic centre may rise to 27 metres. The figure did appear in documents and debates, but there is no single rule. In Podil, the scale of the street and the height of neighbours matter; around Sofia Square and the Upper Town, the historic panoramas; in Pechersk and on the Dnipro slopes, the terrain: a 20 m building on the edge of a slope changes the skyline more than a taller one below. On Andriivskyi Descent, volume and facades are assessed as well. Here the height is set by the regime of a specific zone, not by a general figure.

Where to start if you are buying a plot

As the image at the top of the article shows, the same 1 ha plot under different MUO gives anywhere from 16,000 to 46,000 m² of floor area. The most expensive mistake is buying a plot for floor area that the MUO will not allow. That is why we recommend a pre-design analysis before the deal: we overlay all restrictions on the topographic survey, check the land use, work out the height and building footprints and show how much floor area really fits. For a large area this is master planning with an urban planning calculation, for a single plot, an architectural concept, followed by schematic design.

Sources

  1. Law of Ukraine “On Regulation of Urban Planning Activity” No. 3038-VI, Articles 22-2, 27, 29, 31; as amended on 22.10.2026
  2. Order of the Ministry for Regional Development No. 289 of 06.11.2017 on the list of construction projects for which MUO are not issued; as amended on 13.10.2026
  3. Law of Ukraine “On Protection of Cultural Heritage” No. 1805-III
  4. DBN V.2.2-15:2019 “Residential buildings. Basic provisions” with Amendment No. 1
  5. DBN B.2.2-12:2019 “Planning and development of territories”
  6. Register of urban planning conditions and restrictions, Unified State Electronic System for Construction
  7. Ministry for Development: new functionality for issuing MUO, 06.07.2026

Shelters in new buildings in Ukraine: what the law requires and how much space they take

How much floor area a shelter takes
The official example from DSTU 8855:2019 and the norm of DBN V.2.2-5:2023
Two-section 16-storey apartment building with 192 flats and underground parking, cutaway
The building
16 storeys, 2 sections, 870 m² of parking
192 flats
The same building with one-, two- and three-room flats highlighted on the facade, the basis for counting residents
Residents
21 m² per person plus 10.5 m² per household
393 people
The underground parking seen from above: the shelter in grey on the left with benches, ventilation room and toilets, parking spaces on the right
Shelter in the parking
100% of residents × 0.6 m²
≈ 236 m²
The main shelter room takes
27% of the parking
or the area of 4.5 two-room flats of the same building
Corridors, toilets, ventilation room and protected entrances come on top.

Since 8 September 2026, a new residential complex, hotel or clinic in Ukraine must include a shelter in its design: this is what Law No. 4778-IX requires. Here is when a shelter in a new building is mandatory, how much floor area it takes and how to plan it at the concept stage without losing sellable area.

In this article: What changed · Who it applies to · From when · Which shelter · Floor area · Parking · Safe room · Concept stage · FAQ

In short. Since 8 September 2026, a shelter is mandatory in new CC2 or CC3 residential complexes and hotels with more than 50 permanent occupants or 100 periodic visitors, and in any new clinic, hospital or school, if the right to carry out construction works was obtained after that date. A blast shelter, a radiation shelter or a dual-use structure such as underground parking will do. The norm for housing is 0.6 m² of main room per person: a 192-flat building needs about 236 m². Safe rooms in flats (the Israeli mamad) do not replace the mandatory shelter.

Does your project need a shelter? Three questions tell you:

What are you building?
An apartment building, dormitory or hotel; a clinic, hospital, school or kindergarten; another public building.
How many people and which consequence class?
Housing and hotels: CC2 or CC3 and more than 50 people permanently or 100 periodically. Other public buildings: CC2 or CC3 and more than 150 or 500. Healthcare, education and social care have no threshold.
When was the right to build obtained?
A notice or a permit for construction works after 8 September 2026.
Three “yes” answers: a civil protection structure or a dual-use structure is mandatory (Law No. 3038-VI, Article 31(10)).

Shelters in new buildings: what Law No. 4778-IX changed

Law No. 4778-IX made a shelter a mandatory part of the design for new construction. Since 8 September 2026, the design of a new apartment building, dormitory or hotel of consequence class CC2 or CC3 with more than 50 people permanently or more than 100 periodically, and of any new building of a healthcare, education or social care facility, must include a civil protection structure (a blast shelter or a radiation shelter) or a dual-use structure (Article 31(10) of the Law “On Regulation of Urban Planning Activity”).

Parliament passed the law on 10 February 2026, it was published on 7 March, and the shelter rule took effect six months later, on 8 September. Before that, the civil protection section of a design only “could provide for” building a shelter (Article 31(10) as worded by Law No. 2486-IX of 2022). Now the law itself lists the buildings where a shelter is mandatory and ties the requirement to the date of the right to build. The requirement for the design to be accessible to people with disabilities and other people with reduced mobility remains.

We know these norms from the inside: Maksym Miatko, AIMM’s chief engineer, and I are on the list of authors of the current DBN V.2.2-5:2023 “Civil protection structures”, the building code for shelters in Ukraine. I am now in the working group drafting requirements for safe rooms.

Who the law applies to

In new construction, a civil protection structure or a dual-use structure is mandatory for:

BuildingWhen a shelter is mandatory
Apartment building, dormitory, hotelCC2 or CC3 and more than 50 people permanently or more than 100 periodically
Healthcare facility providing medical and rehabilitation carealways, regardless of class and number of people
Education or social care facility, administrative service centrealways
Other public building: office centre, retail, cultural or sports venueCC2 or CC3 and more than 150 people permanently or more than 500 periodically
Station, metro, airport, portstations from 1,500 passengers a day, the rest always
Facilities with a civil protection category, and those whose staff must shelter in blast sheltersalways
Critical infrastructure of categories I–IVwhere staff work permanently or periodically

The same applies to a reconstruction that changes the building’s use to one of these types, except “other public buildings”. Reconstruction of a part of a building that is not separate is not covered.

The 50-person threshold for housing is low. Residents are counted under DSTU 8855:2019: 21 m² of total area per person plus 10.5 m² per household, so a 52.5 m² two-room flat counts as two people, and more than 50 residents are reached in any building with over 25 such flats. Under the same standard, a residential building of more than four storeys is at least CC2. In practice, almost every section of a modern residential complex falls under the rule.

We often hear that hospitals and schools need a shelter only from class CC2. The law sets no threshold for them: any new building of a clinic, hospital, school or kindergarten must include a civil protection or dual-use structure.

From when, and what about projects already under way

The decisive date is not the approval of the design or the expert review, but the right to carry out construction works: a notice of commencement for CC1 buildings or a permit for CC2 and CC3. If the right was obtained after 8 September 2026, the shelter is mandatory. If earlier, the law allows the design to go without it (Law No. 3038-VI, Section V, item 6-9).

The biggest risk is for projects that have passed the expert review but have not yet received a permit: the shelter is now mandatory for them, so the design has to be revised, and the revised solutions go through the expert review again. The earlier this is spotted, the cheaper it is.

For phased construction, DBN V.2.2-5:2023 sets a separate condition: the phase commissioned first must include a shelter for itself or for the whole development, and every next phase must have one in its own scope or in phases already commissioned (cl. 5.6). The shelter cannot be pushed to the last phase.

The law spreads responsibility across all parties: the designer, the expert, the body issuing the permit, the contractor, construction control and those who accept the building into operation. A building without a shelter that should have been in the design can get stuck at any of these stages.

Which shelter to choose: blast shelter, radiation shelter or dual-use structure

The law lets you choose between a civil protection structure and a dual-use structure. The Civil Protection Code (Article 32) defines them as follows:

Blast shelter

An airtight structure where people can stay for at least 48 hours; it protects against blast waves, fragments, radiation and hazardous chemicals. Blast shelters are required, among others, for patients and staff of healthcare facilities who are not subject to evacuation, if the facility is in a zone of possible heavy destruction.

Radiation shelter

A non-airtight structure for the same 48 hours that reduces radiation, blast and fragment effects. New: radiation shelters for up to 50 people are designed and built from modular units that meet national standards (Civil Protection Code, Article 32, as amended by Law No. 4778-IX).

Dual-use structure

A building or part of one that serves its main purpose every day (parking, a gym, a cinema) and becomes a shelter in an emergency. It is designed with the protective properties of a blast shelter or a radiation shelter; the class or group is set by Annex A of DBN V.2.2-5:2023 depending on where the building stands.

A basic shelter (an unreinforced basement) or a mobile shelter does not meet the law: these are for temporary protection, while a new building needs a civil protection or dual-use structure. Built-in and attached shelters go in underground, semi-basement or basement floors (cl. 6.2); separate and attached ones are placed outside the zone of possible debris from other buildings or get reinforced structures (cl. 6.5). Residents must be able to reach the shelter within 300 m in high-rise areas and 500 m in mid- and low-rise areas (cl. 5.5).

A shelter in the parking: what is inside
The same 192-flat building: the shelter takes part of the parking next to the stair core
Shelter in the underground parking of an apartment building: benches with people, ventilation room, toilets, airlock with protective doors, next to it the stair core and parking spaces
Main room
≈ 236 m²
Area per person
0.6 m²
Room height
from 2.5 m
Evacuation corridors
from 1.8 m
main room with benchesventilation roomtoiletsprotective airtight doors of the airlockstair core with lift

How much floor area a shelter takes

Two numbers set the area: how many people to shelter and how much space each needs. A residential building shelters everyone who lives in it permanently; a hotel or another public building shelters everyone who visits it periodically (DBN V.2.2-5:2023, cl. 6.17–6.18). The minimum main room area for housing and public buildings is 0.6 m² per person, excluding corridors and escape routes (Annex B).

Let’s calculate it on the official example from DSTU 8855:2019: a 16-storey building with 192 flats and 870 m² of underground parking.

  • residents: 64 flats each of one, two and three rooms; the one-room flats count as 92 people, the two-room flats as 128 and the three-room flats as 168, 388 in total, plus 5 parking and concierge staff, 393 people altogether;
  • main room: 393 × 0.6 m² = 235.8 m², i.e. about 236 m²;
  • toilets under cl. 8.3.2, if women and men are split equally (the design brief sets the ratio): 4 toilets for women, 2 toilets and 2 urinals for men, 4 washbasins, and one accessible toilet plus one more for every further 200 people;
  • ancillary rooms: ventilation room, protected entrances (with an airlock in blast shelters from 300 people), water storage; room height from 2.5 m and evacuation corridors from 1.8 m (cl. 7.1.4–7.1.5).

A 236 m² main room takes 27% of the same building’s parking, or as much as 4.5 two-room flats. So for a developer the question is not whether to build a shelter but where to put it: in a separate structure this area drops out of sales, in the parking it works every day.

For other buildings, a rough guide (equal numbers of one-, two- and three-room flats sized as in the DSTU example, no staff):

Flats in the buildingResidentsMain room
100 flats≈ 202≈ 121 m²
200 flats≈ 403≈ 242 m²
400 flats≈ 807≈ 484 m²

Hotel

A hotel counts everyone who visits the building periodically: guests, restaurant and conference visitors (cl. 6.17). So the shelter of a hotel with a conference hall can be larger than the number of rooms suggests. How we plan such solutions together with the operator is described on our Hotels and resorts page.

Clinic and hospital

The norm for healthcare is higher: 1.1 m² per person, with at least 20% of people on beds (Annex B). Capacity is based on the largest number of people who can be in the facility at once (cl. 6.12). For an inpatient hospital the shelter becomes a second hospital underground: it must contain intensive care beds (at least half of the hospital’s intensive care beds), an emergency department, operating rooms, a delivery room, a laboratory and stores of drugs and medical gases (cl. 8.1.1). The code recommends using these rooms every day for their purpose (cl. 8.1.2), so the area does not sit idle.

School and kindergarten

In educational facilities the shelter is sized for everyone: children, teachers and staff, that is 100% of the participants in the educational process (cl. 6.13–6.14). The area norm here is the highest in the code: 3.0 m² per person in a kindergarten, and in a school 1.3 m² for grades 5–12, 1.6 m² for grades 3–4 and 2.0 m² for grades 1–2 (Annex B). Young children are placed not on bunks but on convertible beds and at tables, so the code also recommends a 3 × 4 m play area for each kindergarten group and each grade 1–2 class.

For an existing school or kindergarten where the shelter is added as a separate or attached structure, or a built-in one is reconstructed, capacity may be reduced to 50% in a school and 60% in a kindergarten. The one condition: the shelter holds everyone who can be in the building during the largest shift (cl. 6.13–6.14).

Where to put the shelter: three options
What each option does to the sellable area and whether it meets the law
Dual-use structure in the underground parking of an apartment building
Dual-use structure in the parking
Parking every day, a shelter in an emergency. Planned from the concept stage.
meets the law · no loss of sellable area
Separate underground shelter in the courtyard of an apartment building with an entrance pavilion
Separate shelter in the courtyard
Its own structure, an entrance pavilion, a lawn on top. Takes part of the courtyard and a separate budget.
meets the law
Safe rooms in every flat of an apartment building, highlighted in grey on all floors
Safe rooms in the flats
From USD 3,000–5,000 per flat; takes 6–8 m² in a one-room flat.
does not replace a shelter · Resolution No. 1288

Can underground parking serve as a shelter?

Yes, if the parking is designed as a dual-use structure from the start. Under the Civil Protection Code, a dual-use structure has the required protective properties and is designed, built or adapted to shelter people (Article 32). An ordinary parking garage, designed only for its own loads, does not become a shelter automatically: often only a separate isolated part turns out to be protected.

What we build into a dual-use parking garage at the concept stage:

  • a main room of the required area with seating; it may be split into several zones (cl. 7.3.3);
  • a clear height of at least 2.5 m from floor to slab soffit (cl. 7.1.5) and evacuation corridors at least 1.8 m wide (cl. 7.1.4);
  • protected entrances, filtered ventilation, toilets and water storage;
  • access for people with reduced mobility: ramps (a lift is recommended), threshold-free doors at least 0.9 m wide (cl. 7.1.2, 7.1.7);
  • a separate fire compartment for a built-in shelter (cl. 10.11 as amended by Amendment No. 2);
  • internal transit utility lines only in separate service corridors, with no external or trunk lines running through the shelter (cl. 6.10).

The strongest argument for parking is economic: parking spaces are sold or rented, and the shelter area does not drop out of sales. But the decision has to come before the structural design: the slabs, walls and entrances of a shelter are designed for different loads than those of an ordinary garage.

This is how shelters work in our projects too. At the M3 residential complex with 369 apartments, the shelter is built into the underground car park for 173 vehicles. At the Voices of Children rehabilitation centre, the blast shelter on the lower floor is cut into the slope and becomes a cinema in peacetime. In the ONOKY clubhouse, a 185 m² multipurpose hall doubles as a shelter, and the sports area becomes one too. The reconstruction of the 105-room Hotel Zhytomyr includes a shelter and rooms for guests with reduced mobility. The Dacha centre for 15 families has already been built with a separate shelter.

A safe room (mamad) does not replace a shelter

A protected space, similar to the Israeli mamad, is defined by the law as a room whose structure reduces the indirect effects of conventional weapons on the people inside (Law No. 3038-VI, Article 1). A developer may add such rooms to a new residential or public building on its own initiative; they are not part of the civil protection fund and protect their owners or users.

They cannot replace a mandatory shelter: Cabinet Resolution No. 1288 of 15 October 2026 states plainly that safe rooms do not release anyone from building a civil protection or dual-use structure where one is required.

There are no requirements for safe rooms in housing yet. The draft norms our working group is preparing set at least 1.5 m² per person, protection for at least two hours, reinforced concrete external walls at least 300 mm thick and accessibility for people with reduced mobility. For housing, the document will most likely be advisory. For schools, the government has already launched a pilot project with its own parameters (Resolution No. 1072).

A proper safe room costs at least USD 3,000–5,000 per flat. In an economy-class one-room flat it takes 6–8 m² out of the only kitchen-living room, so on a project in Kyiv Oblast we approved such rooms only for two- and three-room flats with a walk-in closet. I explained what counts as a safe room and what does not in a column for Ekonomichna Pravda (in Ukrainian).

What to decide at the concept stage: 8 decisions

  1. Check whether the building falls under the law: type, consequence class, number of people and the expected date of the construction permit.
  2. Calculate the capacity: residents of housing under DSTU 8855, everyone who visits a public building periodically, and the peak number of people in a clinic.
  3. Choose the shelter type (dual-use parking, separate blast shelter or radiation shelter) and the protection class or group for the location (Annex A of the DBN).
  4. Write the structure type, class or group and capacity into the project name and the design brief: Resolution No. 1288 requires it.
  5. Place the shelter on an underground or semi-basement floor within 300 m of the entrances; keep a separate or attached one outside the zone of possible debris.
  6. Include the shelter in the first construction phase.
  7. Plan access for people with reduced mobility: ramps and preferably a lift, door and corridor widths (more on barrier-free design).
  8. Decide what the room will be every day (parking, a gym, a cinema) and who will maintain it.

If you already have a plot, start with the urban planning conditions (MUO): item 10 covers civil protection. Then we build the shelter into the architectural concept and the schematic design, and as general designer carry it through to construction documents. The residential complexes we have designed are collected on our Residential developments page. For a hotel, see Hotels and resorts; for a large site, start with master planning.

Frequently asked questions

What is the shelter area norm per person?

The minimum main shelter room area is 0.6 m² per person for residential and public buildings, 1.1 m² for healthcare facilities and from 1.3 to 2.0 m² for schools depending on the pupils’ age (DBN V.2.2-5:2023, Annex B). Corridors and ancillary rooms are not included.

How much does a shelter in a new building cost?

There is no single price: the cost depends on the type and protection class, the soil and whether the shelter is combined with parking. The cheapest is a dual-use structure planned into the parking at the concept stage: the area does not drop out of sales, and the structures are reinforced in the design, without rework. A safe room in a flat costs from USD 3,000–5,000.

What can serve as a shelter in a new building?

Only a civil protection structure (a blast shelter or a radiation shelter) or a dual-use structure. An unreinforced basement, a bathroom or a corridor does not meet the law.

Does a private house or a townhouse need a shelter?

The law requires shelters in CC2 and CC3 apartment buildings with more than 50 permanent residents. A private house or a small townhouse usually does not fall under it; a safe room can be added on the owner’s own initiative.

Can a building be commissioned without a shelter?

If the right to build was obtained after 8 September 2026 and a shelter is mandatory for the building, its absence is a violation for which the law holds all parties liable, including those who accept the building into operation. If the right was obtained earlier, a shelter is not mandatory.

Sources

  1. Law of Ukraine No. 4778-IX of 10 February 2026 on preventing emergencies and forming the fund of civil protection structures (in Ukrainian)
  2. Law of Ukraine “On Regulation of Urban Planning Activity” No. 3038-VI, Article 1 (item 4-2), Article 31(10), Section V (item 6-9); the previous wording of Article 31(10) by Law No. 2486-IX of 29 July 2022
  3. Civil Protection Code of Ukraine, Article 32
  4. DBN V.2.2-5:2023 “Civil protection structures” with Amendments No. 1 and No. 2: cl. 5.5, 5.6, 5.10, 6.2, 6.5, 6.10–6.18, 7.1, 7.3, 7.5, 8.1, 8.3, 10.11, Annexes A and B
  5. DSTU 8855:2019 “Buildings and structures. Determination of the consequence class”, cl. 4.15, 5.1, example B.2
  6. Cabinet of Ministers Resolution No. 1288 of 15 October 2026 (amendments to Procedure No. 138)
  7. Cabinet of Ministers Resolution No. 1072 of 31 August 2026 (safe rooms in schools)
  8. Anna Iskierdo, “Mamad, Ukrainian style: protection or illusion”, Ekonomichna Pravda, 18 November 2026

Design brief in Ukraine: template, contents and who approves it

Three documents every project starts with: MUO set the limits (height, setbacks, restricted zones), technical conditions describe utility connections, the design brief sets uses, areas, storeys and budget; together they are the main initial design data

A design brief (in Ukrainian, zavdannia na proiektuvannia) is where the client sets out justified requirements for the future building: planning, architectural, engineering and process solutions, key parameters, cost and how construction is organised. Together with the urban planning conditions and restrictions (MUO) and the technical conditions for utility connections, it forms the main initial design data, and no design work starts without it.

In this article: What it is · Who approves · E-system · What changed · At the start · 32 items · Examples · Mistakes · Design changes · DOCX template · FAQ

In short. The client drafts and approves the brief; the general designer agrees it. From 28 August 2026, the brief must be created as an electronic document: the client approves it with a qualified electronic signature (QES), and the general designer agrees it with an electronic signature based on a qualified certificate. As before, the general designer uploads a copy to the Construction Activity Register of the Unified State Electronic System for Construction. Annex B of DBN A.2.2-3:2014 suggests what to include: 32 items after Amendment No. 2. There is no approved form, so below you will find our DOCX template with a tip for every item.

What a design brief is

The Law of Ukraine “On Regulation of Urban Planning Activity” names the design brief as one of the three main components of the initial design data, alongside the urban planning conditions and restrictions (MUO) and the technical conditions (Article 29). Annex B of DBN A.2.2-3:2014 gives a recommended list of items, and the Procedure for Developing Design Documentation (Order No. 45 of the Ministry of Regional Development) sets how the brief is agreed and approved.

As the diagram above shows, the three documents answer different questions. MUO say within what limits you can build on the plot: height, site coverage, setbacks, restricted zones (see our article on MUO). Technical conditions say which utilities to connect to and with what capacity. The design brief says what exactly is being built: uses, areas, storeys, budget. It cannot contradict the other two: by law, the brief is drawn up in line with the MUO and the technical conditions (Law “On Architectural Activity”, Article 1), and the client is expressly prohibited from including in the brief any requirements that contradict legislation, approved urban planning documentation or building codes (Article 27).

“Technical assignment” or “design brief”? It is the same document. In Ukraine people often say “technical assignment” (tekhnichne zavdannia), and in English it is also called a design assignment or terms of reference for design. The law and the codes call it zavdannia na proiektuvannia, which we translate as “design brief”. In the codes, tekhnichne zavdannia means something else: a separate technical specification, for example for custom-made equipment (Order No. 45, cl. 15.3).

The brief becomes the yardstick for the design: the law defines agreeing a design as checking that its solutions match the initial data (Law “On Architectural Activity”, Article 1). So everything that matters to the client belongs in the brief, because that is what the design is checked against.

Who drafts, agrees and approves the brief

The roles are set by law and Order No. 45:

  • drafts: the client (Law “On Regulation of Urban Planning Activity”, Article 29(9)). In practice the text is written together with the architect: the client knows what they want, and the architect knows how to put it in the language of the codes;
  • agrees: the general designer, with an electronic signature based on a qualified certificate (a QES will do);
  • approves: the client, with a qualified electronic signature (Order No. 45, cl. 4.1);
  • uploads: the general designer, who enters a copy of the brief in the Construction Activity Register through their electronic account (Order No. 45, cl. 4.1; the procedure is set by the Procedure for Maintaining the Unified State Electronic System for Construction).

The client decides the content and, from 28 August 2026, Order No. 45 expressly requires them to ensure that the documents submitted for design are accurate (cl. 3). Some decisions are joint: the client and the general designer decide together how many design stages there will be, regardless of the consequence class (cl. 11.1).

Two special cases. If new construction or reconstruction is financed from state capital investment or from loans raised by the state or backed by state guarantees, the brief is based on an approved or selected investment project (Order No. 45, cl. 4.1). For the restoration of architectural monuments, a restoration brief is drawn up under DBN A.2.2-14-2016 (Order No. 45, cl. 4.3).

How to file the brief in the state e-system

The brief is drawn up as an electronic document, and the general designer uploads a copy to the Construction Activity Register of the Unified State Electronic System for Construction through their electronic account (Order No. 45, cl. 4.1). Before you start, have ready the numbers and dates of the MUO and the technical conditions (or the reason MUO are not required), the cadastral number of the plot, the general designer’s EDRPOU code, the consequence class, the design stages, the source of financing and a text already worked out with the architect. The signing order: first the general designer agrees, then the client approves.

What changed on 28 August 2026

On 28 August 2026, amendments to Order No. 45 took effect. They were made by Order No. 1345 of 13 July 2026 of the Ministry for Communities and Territories Development. We compared the old and new versions clause by clause; for the design brief and the related rules this is what changed:

AspectBefore 28 August 2026From 28 August 2026
Formcould be created as an electronic documentmust be created as an electronic document
Approvalby the client, subject to the general designer’s agreementby the client with a qualified electronic signature, after the general designer has agreed it
Paper formallowedonly for briefs containing state secrets and, during martial law and for one year after it, for briefs marked “For Official Use Only” concerning critical infrastructure and defence projects
Client’s dutyto provide the initial dataalso to ensure the documents submitted for design are accurate
Project nametype of construction and locationfor protective and dual-use structures, also the type of structure, its class (group) and capacity (cl. 8)
Design changesdesign to the codes in force on handover to the clientdesign to the codes in force on the date of the expert report; listed grounds for changes, buyer consent, expert review (cl. 15.5)

The practical takeaway: the “sign with a pen, scan, upload a PDF” routine still described in many guides no longer works for ordinary projects. Settle the text with the architect first, then sign the finished electronic document.

What the architect asks for at the start

Besides the three main documents, DBN A.2.2-3:2014 lists other initial data the client provides (Annex A); the exact list is set out in the design contract. Most often the architect asks for:

  • an extract from the current urban planning documentation of the area;
  • a topographic survey and a geotechnical investigation: for new construction they are mandatory (DBN A.2.2-3:2014, cl. 4.1b), and the brief describes them in item 10;
  • a digital terrain model or a built asset information model, including a scan point cloud, if available (an item added by Amendment No. 2);
  • for reconstruction and major repair: a structural survey report, measured drawings, utility records;
  • data for construction organisation and cost estimates;
  • initial data for the civil protection section, if one is needed.

Three more things are worth putting into words before your first meeting with the architect: the functional programme (what goes into the building and how much of it; it will go into item 12 of the brief), the construction budget cap (the law expressly puts cost in the brief) and the operating model (sale, lease or operation by the owner). The operating model is not on any list, yet it drives almost everything, from the apartment mix to the finish level. With this set, the architectural concept starts without wasted rounds of rework.

What to include: 32 items in 6 blocks

The list of items comes from Annex B of DBN A.2.2-3:2014 “Design brief. List of main data and requirements”. The annex is informative, not mandatory: the content may be adjusted to the project (Note 2). Amendment No. 2, in force since 1 July 2022, rewrote nine items and added five, so there are now 32. If your sample has 27 items, it predates Amendment No. 2. We have grouped the items into six blocks by topic; the numbering follows the DBN, and the tips are the same as in the DOCX template.

1. Project and parties

ItemWhat to write
1. Name and location of the projectA name that states the type of construction and the place: “New construction of an apartment building with built-in non-residential premises at …”. The cadastral number of the plot. The name stays the same at every design stage (Order No. 45, cl. 8); for protective and dual-use structures it also states the type of structure, its class (group) and capacity.
2. Grounds for designThe client’s decision to build (owner’s resolution, minutes, contract) and the details of the initial data: number and date of the MUO and the technical conditions. If MUO are not required, the legal basis for that.
3. Type of constructionNew construction, reconstruction, restoration or major repair. The type must match the project name.
4. Investor detailsName, company registration code (EDRPOU), address. If the investor and the client are the same entity, say so.
5. Client detailsName, EDRPOU code, address and the person who signs the brief with a qualified electronic signature. The document confirming ownership or use of the plot (or a superficies agreement).
6. Source of financingOwn funds, a loan, public budget or mixed financing. For new construction or reconstruction financed from state capital investment or state-guaranteed loans, the brief is based on an approved (selected) investment project (Order No. 45, cl. 4.1).
8. General designer detailsName, EDRPOU code, chief project architect and/or chief project engineer with their qualification certificate numbers.

2. Design organisation

ItemWhat to write
7. Need for investment efficiency calculations based on design optionsWhether several options should be compared by cost and return. For a developer, it pays to have two or three massing options at the concept stage, each showing its saleable area.
9. Design stages and the approval stageOne, two or three stages, for example schematic design (EP) → design stage (P) → construction documentation (R), and which one is approved. The client and the general designer decide together (Order No. 45, cl. 11.1).
13. Construction phasing and the need for separate commissioning packages (start-up complexes)How many phases and what each includes. Design documentation for a separate phase can be approved only if the brief provides for it and the approved previous stage (schematic design or a feasibility study) reflects it (Order No. 45, cl. 9).
15. Instructions on additional work (seven sub-items)Tick only what is needed: separate technical specifications and individual technical requirements; options or a competition; preliminary approvals; renderings, a physical model, interior drawings (including from a 3D model); research and scientific support, taking BIM into account; technical protection of information; data exchange rules and information model requirements. Also: whether a preparatory works design is needed (DBN A.2.2-3, cl. 4.7).
28. Need for scientific and technical supportWhether scientific and technical support is needed (for complex structures, high-rise buildings, new technologies) and who provides it.
31. Requirements for the electronic version of the design documentationFormats: PDF with a qualified electronic signature for the state e-system, drawings in DWG, an IFC information model if the project is run in BIM.
32. Bill of quantities (international measurement standards may be used)Format (XLSX), breakdown by sections and phases; for a foreign investor, international measurement standards if needed.

3. Site and construction conditions

ItemWhat to write
10. Engineering surveysWhat already exists (1:500 topographic survey, geotechnical investigation, building surveys) and who orders the rest. Without geotechnical data, do not promise underground floors.
11. Special construction conditions (seismicity, collapsible soils, undermined areas and areas with high groundwater, etc.)Seismicity, collapsible soils, high groundwater, mine workings, dense surrounding development, utilities crossing the plot. If none apply, say so.
18. Engineering protection of the site and buildings against natural and man-made hazardsHigh groundwater, landslides, slopes, retaining walls, drainage. Especially for sloping plots and plots near water.
19. Environmental impact section (OVNS), taking into account the environmental impact assessment, if anyScope of the environmental section. If the project is subject to an environmental impact assessment, the section takes its results into account and the results are attached to the design (Order No. 45, cl. 21).

4. Architecture and functional programme

ItemWhat to write
12. Main architectural and planning requirements and characteristics, including functional groups, names and areas of roomsThe key item for a developer: the functional programme. Room groups with areas and quantities; for housing, the apartment mix (types, areas, shares); for a hotel, the room count; for an office, the number of workplaces. Storeys within the MUO.
14. Consequence class, and design service life of the building and of its main structural and process solutionsConsequence class CC1, CC2 or CC3 for each building under DSTU 8855, and the design service life. The class drives the expert review and the content of the design.
16. Capacity or characteristics of the project, production programmeKey figures: total floor area, number of apartments, hotel rooms, seats or visitors, parking spaces; for industry, the capacity and production programme.
17. Landscaping and site improvement requirementsCourtyards, play and sports areas, planting, paving, lighting, fences, waste collection points. Attach reference images if you have them.
26. Use of non-residential floorsWhat goes on the ground and underground floors: commercial units with separate entrances, parking, storage, plant rooms.
27. List of buildings and structures designed as part of the complexEvery building and structure of the complex: sections, parking, transformer substation, boiler house, pumping stations, each assigned to a phase.

5. Engineering and resources

ItemWhat to write
20. Energy saving and energy efficiencyTarget energy efficiency class, heat source (individual heating substation, boiler house, heat pump), heat recovery, solar panels, metering.
21. Technologies and/or research proposed by the clientStructural system and materials if the client has requirements: in-situ concrete frame, timber structures, modular solutions, specific facade systems or equipment.
30. Balanced use of natural resources under DSTU 9171Water, energy, materials and waste: rainwater harvesting, waste sorting, reused materials.

6. Safety and accessibility

ItemWhat to write
22. Security regime and occupational safetyAccess control, CCTV, guarding, separate routes for staff and visitors; for industry, working conditions.
23. Civil protection engineering measures sectionAs a separate item (Order No. 45, cl. 4.2). Whether a protective structure (blast or radiation shelter) or a dual-use structure is needed: for a new CC2 or CC3 apartment building, dormitory or hotel with more than 50 people permanently or 100 periodically, it is mandatory (Law “On Regulation of Urban Planning Activity”, Article 31(10)). How much floor area it takes is covered in our article on shelters in new buildings.
24. Fire safety requirementsRequirements beyond the codes, if a tenant, operator or insurer sets them: sprinklers, alarm systems, smoke extraction.
25. Special measuresMeasures the specific building requires: noise and vibration protection, shielding, special regimes. If none, write “not required”.
29. Barrier-free access for people with limited mobility under DBN V.2.2-40As a separate item (Order No. 45, cl. 4.2): step-free entrances and routes, lifts, toilets, the number of apartments or rooms for people with disabilities.

Order No. 45 requires items 23 and 29 of the brief to be stated separately (cl. 4.2). If preparatory works are needed, the brief also states that a preparatory works design will be developed (DBN A.2.2-3:2014, cl. 4.7). How to build accessibility into a design from the first sketch is covered in our article on barrier-free design under DBN V.2.2-40.

How to word the items: vague vs specific

The samples that search engines return were mostly drawn up for major repairs and public projects, where vague wording does little harm. For a residential complex, a hotel or an office, every such phrase turns into extra rounds of rework. Five places where the difference is greatest (illustrative examples):

Item 12, functional programme.
Vague: “Residential building, areas to be determined by the design.”
Specific: “An 8-storey residential building within the 27 m height limit set by the MUO, 105 apartments: 1-room 38–42 m² (40%), 2-room 55–62 m² (40%), 3-room 78–85 m² (20%); non-residential ground floor with commercial units with separate entrances.”

Item 9, design stages.
Vague: “Stages as per the codes.”
Specific: “Three stages: schematic design, design stage (P), construction documentation (R). The approval stage is P; the client signs off the schematic design before stage P begins.”

Item 13, phasing.
Vague: “Phasing as needed.”
Specific: “Two phases: phase one with sections 1–2, parking and a transformer substation; phase two with sections 3–4. Each phase operates on its own; the phases are shown in the schematic design, and stage P is developed and approved for each phase separately.”

Cost. The law expressly puts it in the brief (Law “On Regulation of Urban Planning Activity”, Article 29(10)).
Vague: “Cost to be determined by the estimate.”
Specific: “Construction budget cap: … UAH including VAT. If the estimate exceeds it, the priority is to keep the number of apartments and the ceiling heights and to simplify the finishes of common areas.”

Item 31, electronic version.
Vague: the item is left out.
Specific: “PDF with a qualified electronic signature for the state e-system, drawings in DWG, an IFC information model at stages P and R.”

MacLeamy curve: the ability to influence the design is highest at the brief stage and falls towards construction, while the cost of changes rises from the brief to construction

Common mistakes and why changes get more expensive

At the brief stage, changing a decision costs a few lines of text. At the construction documentation stage, the same change means redoing whole parts of the documentation; on site, it means demolition. Architects know this as Patrick MacLeamy’s curve: the ability to influence the design falls while the cost of change rises. That is why mistakes are cheapest to fix in the brief. The most common ones:

  1. “Areas to be determined by the design”. Without a functional programme the concept is reworked until the client sees what they had in mind.
  2. A programme that ignores the MUO. A brief for 12 storeys under a 27 m height limit will not make them possible: the design will run up against the MUO height limit anyway. How a height limit becomes storeys is explained in our article on MUO.
  3. No surveys. An underground car park written into the brief without geotechnical data may turn out far more expensive or impossible.
  4. No phasing. A separate phase can be approved only if the brief provides for it and the approved previous stage (schematic design or a feasibility study) reflects it (Order No. 45, cl. 9). Two-stage design (P and R) has no such stage, so adding phases to a finished design means a design change.
  5. A “floating” name. The project name in the design must match the brief and stay the same at every stage (cl. 8); otherwise every document has to be corrected later.
  6. Accessibility and civil protection in one line. The Order requires them as separate items in the brief (cl. 4.2).
  7. Someone else’s sample. A form for a ramp repair does not fit a residential complex: the content of the brief depends on the project (Note 2 to Annex B).

Design changes: how to amend an approved design

Changes to an approved design are made on the basis of a change brief. Order No. 45 expressly treats it as a design brief, so it is drawn up and approved the same way. From 28 August 2026, the grounds are (cl. 15.5): new building codes or amendments to them (once the right to start construction has been obtained, the client decides whether to make such changes); unforeseen circumstances that change the main design solutions, the scope of work and the key technical and economic indicators; for publicly funded projects, also an outdated cost estimate or an exhausted budget limit; in other cases, the client’s decision. The design must comply with the codes in force on the date of the expert report. What else a developer should know:

  • a change of client during construction is not in itself a ground for changing the design;
  • changed solutions in a design that underwent mandatory expert review are reviewed again (Procedure for Approving Construction Projects, cl. 11), and if the consequence class goes up after the change (from CC1 to CC2 or CC3, or from CC2 to CC3), expert review is mandatory (Order No. 45, cl. 15.5);
  • if a special property right of buyers, or an encumbrance in favour of those who have paid part of the price, is registered for future apartments or units, a number of changes require their consent (Law “On Regulation of Urban Planning Activity”, Article 31(12)): all such buyers, when the building’s use changes, its energy performance or energy efficiency class goes down, or technical and auxiliary spaces shrink by more than 5% to create new units; those whose units are on a floor adjacent to the one added or removed, or on a floor being removed, when the number of storeys changes; the specific buyer, when the use or the area (by 10% or more) of their unit changes or the unit is removed from the design. If a buyer does not reply within 30 days, consent is deemed given, except for a change of use of their unit or its removal from the design;
  • if another design firm makes the change, the amended design is agreed with the original designer, unless the economic rights to the design have been transferred (cl. 15.4).

Design brief template (DOCX)

There is no statutory template: Annex B only lists the items, and the codes do not approve a form. So we put together a working template that makes it easy to settle the content before signing:

  • the 32 items of Annex B in six blocks, with an architect’s tip for each;
  • an “Agreed” and “Approved” header for electronic signatures;
  • the sub-items of item 15 on separate lines, to tick what is needed;
  • a checklist of other initial data under Annex A.
Design brief template in DOCX: “Agreed” and “Approved” header for electronic signatures, a table of the 32 items of DBN A.2.2-3 with an architect’s tips

Download the design brief template (DOCX, 18 KB)

Ukrainian version: zavdannia na proiektuvannia template (DOCX, 20 KB). The official brief in the state e-system is drawn up in Ukrainian; delete the tips column before signing.

FAQ

Is a design brief needed for a major repair?

Yes, and the brief decides whether a simplified design is enough. For a CC1 building, a major repair that only improves its performance may, if the brief provides for it, be designed in a single stage: a working design consisting of a defect report, an explanatory note and a cost estimate (Order No. 45, cl. 11.2). Work to ensure access for people with limited mobility is listed in a separate section of the defect report. During martial law, a major repair of buildings damaged by the war may be designed in the same way regardless of the consequence class, on the basis of a survey report; this decision is also recorded in the brief (Procedure for Approving Construction Projects, cl. 3).

How many design stages are there and who chooses?

Design is done in one, two or three stages. One stage: a working design. Two stages: for CC1 buildings (and complexes made up only of them), schematic design and working design; for CC2 and CC3 (and complexes with at least one such building), the design stage (P) and construction documentation (R). Three stages: schematic design, P and R. For industrial and linear infrastructure projects, a feasibility calculation (TER, two stages) or a feasibility study (TEO, three stages) replaces schematic design. The client and the general designer choose together and record it in item 9 of the brief.

Who approves the design documentation?

The client, too (Law “On Regulation of Urban Planning Activity”, Article 31(1)). In two- and three-stage design, the design stage (P) or the working design is approved, while schematic design is only endorsed (Procedure for Approving Construction Projects, cl. 3). Designs of CC2 and CC3 buildings are subject to mandatory expert review before approval, and for publicly funded projects the approving authority depends on the construction cost. More on the design stage (P) page.

How does the brief differ from the design contract?

The contract describes the designer’s work: scope, timing, fee and the list of initial data the client provides. The brief describes the building itself: what is being designed and to what requirements. So a change to the brief usually means a change to the contract as well.

Where to start

If you already have a plot, start with the MUO: they set the limits for the whole brief. Then put the programme and the budget into words and bring them to an architect. At the concept stage we check whether the programme fits the MUO and help write a brief that works at every stage: schematic design, design stage (P) and construction documentation (R). As general designer, we agree the brief with our signature. For a large site, start with master planning.

Sources

  1. Law of Ukraine “On Regulation of Urban Planning Activity” No. 3038-VI, Articles 29, 31; as amended on 22.10.2026
  2. Law of Ukraine “On Architectural Activity” No. 687-XIV, Articles 1, 27; as amended on 15.11.2024
  3. Procedure for Developing Design Documentation for Construction (Order of the Ministry of Regional Development No. 45 of 16.05.2011), as amended by Order No. 1345 of 13.07.2026 of the Ministry for Communities and Territories Development (in force from 28.08.2026)
  4. DBN A.2.2-3:2014 “Composition and content of design documentation for construction” with Amendments No. 1 and No. 2, cl. 4.1b, 4.6, 4.7, Annexes A and B
  5. Procedure for Maintaining the Unified State Electronic System for Construction (Cabinet of Ministers Resolution No. 681 of 23.06.2021)
  6. Procedure for Approving Construction Projects and Their Expert Review (Cabinet of Ministers Resolution No. 560 of 11.05.2011), cl. 3, 11