Master planning
A master plan shows where the buildings, streets and parks will go on a large site and in what order to build them, before any individual building is designed. From a 3-hectare site to a 170-hectare urban district.
Discuss your siteOMRIYANE CITY, Bilohorodka · 62.5 ha · under construction
What to build, where and in what order
Developers take a master plan to investors and banks, and architects design the individual buildings from it. The AIMM portfolio comprises 12 sites totalling more than 516 hectares: the TELYCHKA CITY urban district at 170 hectares, HELSI RESORT at 111.8, the OMRIYANE CITY mixed-use complex at 62.5, residential quarters and a rehabilitation centre. Eleven sites are in Ukraine and one is in the Dominican Republic. Six projects are under construction. In 2026 TELYCHKA CITY was shortlisted at the World Architecture Festival in the Future Projects: Masterplanning category.
Our sites at the same scale
Each square shows the area of a site. Hatched squares are projects under construction; outlined squares are at the design stage. Hover over a square or tap it to see the project.
- 01 TELYCHKA CITY 170 ha · Kyiv · design
- 02 HELSI RESORT 111.8 ha · Truskavets · design
- 03 OMRIYANE CITY 62.5 ha · Bilohorodka, Kyiv region · under construction
- 04 Domini village 44.9 ha · Dominican Republic · design
- 05 Adavel 38.4 ha · Poltava · design
- 06 Bucha 27.6 ha · Bucha, Kyiv region · design
- 07 White Valley 25 ha · Bila, Ternopil region · design
- 08 CentralPark 13.4 ha · Uzhhorod · under construction
- 09 ONOKY River Club 10.7 ha · Orikhovytsia, Zakarpattia · under construction
- 10 DNIPRO ISLAND 4.5 ha · Kyiv · under construction
- 11 CREATOR CITY 4.3 ha · Kyiv · under construction
- 12 Voices of Children 3.18 ha · Dzvinkove · under construction
12 AIMM master plans
-
design
170 haTELYCHKA CITY
new urban district Kyiv · 2021 -
design
111.8 haHELSI RESORT
residential and wellness resort Truskavets · 2024 -
under construction
62.5 haOMRIYANE CITY
mixed-use complex Bilohorodka, Kyiv region · 2025 -
design
44.9 haDomini village
villas and a hotel Dominican Republic · 2024 -
design
38.4 haAdavel
residential and retail complex Poltava · 2024 -
design
27.6 haBucha
residential complex for 11,000 residents Bucha, Kyiv region · 2021 -
design
25 haWhite Valley
serviced-apartment complex, 40 buildings Bila, Ternopil region · 2022 -
under construction
13.4 haCentralPark
residential quarter Uzhhorod · 2024 -
under construction
10.7 haONOKY River Club
serviced-apartment resort Orikhovytsia, Zakarpattia · 2025 -
under construction
4.5 haDNIPRO ISLAND
residential complex Kyiv · 2024 -
under construction
4.3 haCREATOR CITY
residential complex, 8 buildings Kyiv · 2020–2026 -
under construction
3.18 haVoices of Children
rehabilitation centre, 3 buildings Dzvinkove · 2024
OMRIYANE CITY: 62.5 hectares outside Kyiv
Six steps from the site to the look of the finished complex. The drawings are from the project’s drawing set.
- Developer
- KREATOR
- Site area
- 62.5 ha
- Storeys
- 1–7
- Year
- 2025
- Status
- under construction
-
01 / 06
Site and constraints
We record what is already on the site: boundaries, terrain, utilities, protection zones and sanitary buffer zones. This decides where building is possible and where it is not.
Sheet: site constraints -
02 / 06
Land use
We divide the site between apartment buildings, houses and rental housing, and lay out the main streets.
Sheet: land use -
03 / 06
Built form
We define the block shapes and the building type for each part of the site.
Sheet: built form -
04 / 06
Master plan
Everything comes together in one plan: buildings and courtyards, a school, a stadium, the main square, a promenade, streets and construction phases.
Sheet: master plan -
05 / 06
Movement and access
We work out separately where cars drive, where people walk and where the open car parks and barriers go.
Sheet: movement and access -
06 / 06
Visuals first, then buildings
Sketches and visuals show investors and buyers the future complex before construction starts. Individual building designs follow.
Sheet: sketch
TELYCHKA CITY: 170 hectares of industrial land on the Dnipro
Five diagrams, from site analysis to the proposal: how an industrial zone between two bridges becomes an urban district. The project was shortlisted at the World Architecture Festival 2026.
- Site area
- 170 ha
- Location
- between the Darnytskyi and Pivdennyi bridges
- Year
- 2021
- Status
- design
- Recognition
- WAF 2026 shortlist
-
01 / 05
Where the site is
170 hectares on the Dnipro between the Darnytskyi and Pivdennyi bridges, next to the Hryshko National Botanical Garden and Vydubychi metro station.
Diagram: site location -
02 / 05
What holds the area back
The Naddniprianske highway and the railway cut the area off from the city. The riverbank is underused, the area is run-down, the environment is poor, and industry still sits in the middle of the city.
Diagram: what holds the area back -
03 / 05
What is there now
The land is split between many companies and owners: precast concrete plants, woodworking and construction works, warehouse stores, car repair shops, a supermarket and an art cluster.
Diagram: businesses on the site -
04 / 05
Links to the city
A cycle and pedestrian bridge crosses the highway and the railway to the Botanical Garden, and a green bridge spans the Vydubychi interchange. Inside the district are embankments, a promenade, a harbour and an artificial canal, with cycle paths and green corridors leading to the metro.
Diagram: pedestrian links, cycle paths and green corridors -
05 / 05
What the district holds
Housing takes up the most space, followed by business centres with offices and an IT cluster. The district also has sports and public buildings, a science and education hub, a university, schools and nurseries, shops, an aquapark, a cultural centre, a hospital and hotels.
Diagram: building uses
What stage are you at?
- You have a site and need to know what can be built on it and how much. Capacity study
- You need a development concept for an investor or a bank. Discuss a master plan
- The master plan is ready. Time to design the buildings. Architectural concept, then schematic design
- An industrial zone or a derelict site that needs a new lease of life. Article: 100 hectares of industrial land become an urban district
The people behind the master plans
Nataliia Korotka
Nataliia works on the siting of buildings, landscaping and the links between a site and the city. She wrote a column for PRAGMATIKA.MEDIA on when vertical greening actually pays off.
Awards for projects in this sector
More on master planning
What else AIMM designs
-
Residential developments16 developments
-
Hotels and resorts13 projects · 5 countries
-
Office buildings12 projects
-
Healthcare5 facilities
a request