From Kyiv to Bali
AIMM hotels and resorts along a route from Kyiv, with straight-line distances. Under each point are the projects and their awards.
-
0–20 km
Kyiv and Kyiv region
- A96 offices, housing and a hotel · design
- Lisnyky Country Club country hotel and tennis complex · design
-
≈ 135 km
Zhytomyr
- Hotel Zhytomyr reconstruction of a 105-room hotel · completed
-
≈ 500–630 km
Carpathians
- Arleville hotel reconstruction with a new building · design
- GRAND HILLS de BUKOVEL hotel with a ski run · competition entry
- HELSI RESORT residential and wellness resort · design
- ONOKY River Club serviced-apartment resort · under construction · REM Awards 2026
-
≈ 1,000 km
Sofia, Bulgaria
- 5-star hotel SOFIA existing building converted to a hotel with a casino · design
-
≈ 1,500 km
Antalya, Turkey
- DESIRE hotel and residential complex · under construction · IPA Europe Winner
-
≈ 6,500 km
Maldives
- Radisson Resort Maldives 100-room hotel · design · Five Star award
-
≈ 10,400 km
Bali, Indonesia
- Taryan Dragon Anantara resort and residential complex · under construction · IHA International Winner
- RAMADA NUSA DUA branded art hotel with 100 rooms and 59 villas · under construction · Five Star award
- Amani Melasti coastal hotel complex · under construction · winner
Hotels for owners and investors, including under international brands
The AIMM portfolio comprises 13 projects in five countries: Ukraine, Bulgaria, Turkey, the Maldives and Indonesia. They include Hotel Zhytomyr, a 105-room hotel that reopened in 2026 after a reconstruction designed by the firm; the Taryan Dragon Anantara resort and residential complex in Bali, International Winner for New Hotel Construction & Design at the International Hotel Awards 2025–2026; a 100-room Radisson hotel in the Maldives; and the RAMADA NUSA DUA art hotel. Five projects are under construction. The smallest complex covers 0.22 hectares; the largest resort, HELSI RESORT in Truskavets, covers 111.8 hectares.
The hotels and resorts we have designed
-
completed
Hotel Zhytomyr
reconstruction of a 105-room hotel Zhytomyr · 2026 -
under construction
1.8 haTaryan Dragon Anantara
resort and residential complex Bali, Indonesia · 2023–2026 -
under construction
1.28 haRAMADA NUSA DUA
branded art hotel with 100 rooms and 59 villas Nusa Dua, Bali · 2024 -
under construction
0.22 haAmani Melasti
coastal hotel complex Bali, Indonesia · 2024 -
design
2.1 haRadisson Resort Maldives
100-room hotel Thulusdhoo, Maldives · 2026 -
under construction
0.77 haDESIRE
hotel and residential complex Antalya, Turkey · 2024 -
design
0.6 ha5-star hotel SOFIA
existing building converted to a hotel with a casino Sofia, Bulgaria · 2023 -
design
0.62 haArleville hotel
reconstruction with a new building Polianytsia, Bukovel · 2024 -
competition entry
4.6 haGRAND HILLS de BUKOVEL
hotel with a ski run Bukovel · 2022 -
design
111.8 haHELSI RESORT
residential and wellness resort Truskavets · 2024 -
under construction
10.7 haONOKY River Club
serviced-apartment resort Orikhovytsia, Zakarpattia · 2025 -
design
0.45 haLisnyky Country Club
country hotel and tennis complex Lisnyky, Kyiv region · 2018 -
design
0.54 haA96
offices, housing and a hotel Kyiv · 2019
Reconstruction with a new building
Terraced cottages and an administrative and recreation building stood on a Carpathian site. The new use: a hotel with a spa and a rooftop bar.
- Developer
- VERTEX
- Site area
- 0.62 ha
- Storeys
- 8
- Total floor area
- 5,811 m²
- Location
- Polianytsia, Bukovel
- Status
- design, 2024
-
01 / 04
What to keep and what to take down
The terraced cottages were kept and strengthened, and three upper floors of the main building were taken down.
Sheet: demolition plan -
02 / 04
The new building
The new building becomes the centre of the complex: a spa with a pool and jacuzzi, a wellness bar, a coworking space, a conference hall and a rooftop lounge bar overlooking the Carpathians.
Sheet: new volume on the site -
03 / 04
Facades and roofs
The hotel was given dynamic facades, and the existing cottages a new roof concept. The complex reads as a coherent whole.
Sheet: facades in the context of the site -
04 / 04
A route for guests
Despite the dense layout, there is a walking route with viewing platforms, gazebos on the hills and a high-ropes course.
Visual
What stage are you at?
- You have a site for a hotel or a resort and need to work out the format and number of rooms. Architectural concept
- You have an operator with its own brand standards and need a design that meets them. Schematic design
- You have buildings to keep and turn into a hotel. Arleville case study: reconstruction with a new building
- A resort with villas, apartments and infrastructure. Master planning
The people behind the hotels
Anna Iskierdo
Architect, civic activist, co-founder and CEO of the architecture and design firm AIMM, and Chair of the Board of the Architectural Chamber of Ukraine Foundation.
“A hotel begins with an understanding of how people will live in it: what guests will feel, how the team will work, what will make them come back. The operator brings the experience of its network to the project, and we translate it into architecture, from room layouts to the daily routes of guests and staff. When this dialogue starts with the first sketch, space, service and business work in harmony, and the owner avoids costly rework to meet brand standards. This is how we developed the concept of the Radisson hotel in the Maldives: together with the chain, we built in solutions that combine expressive architecture, guest comfort and the efficiency of the future hotel.”
Awards for projects in this sector
More about hotels
What else AIMM designs
-
Residential developments22 complexes
-
Master planning12 sites · over 516 ha
-
Office buildings12 projects
-
Healthcare5 facilities
a request














